LCPDP_REPORT_June_2019
This document provides a least cost generation expansion plan for Rwanda’s electricity system. The Development of the Least Cost Power Development Plan (LCPDP) was undertaken as part of the key exercises under the REG Reform programme that buildings on earlier work that had
been carried in 2014. The purpose of the plan is to have a systematic development of the Rwanda Generation Resources prioritizing the least cost options so as to ensure that the tariff affordability objectives are being optimized.
Attachment(s)
- LCPDP_REPORT_June_2019.pdf (1.5 MB)
Something wrong with this information? Report errors here.